C&C Landfall 38
Detailed Project Posts(click on links below)
- Engine Work
- Deck and Topsides
- Topside Repair Work and Painting
- New Transom Swim Ladder
- Repairing Teak Toe Rail and Teak Rub Rails
- Deck Painting
- Installing Deck Hardware
- Repairing Broken Dorade Box
- Hatches and Ports
- New Fixed Ports
- Renewing small and medium sized Atkins and Hoyle Hatch lenses
- Renewing the main Atkins and Hoyle bow Hatch
- Replacing the Companionway Sliding Hatch
- Bottom and Hull Work
- Steering System
- Standing Rigging
- Running Rigging
- Heating and A/C System
- Plumbing
- Seawater Washdown System
- Resurrecting the Marine Head
- Adding Active Ventilation to the Holding Tank
- Getting Fresh Water to the Head (remove sea water stink)
- Water Heater Installation
- Installing All New Fresh Water Plumbing
- Repairing a Leaky Water Tank
- Galley Updates
- Interior
- Reupholstering the Cabin Cusions and Making Cabin Curtans
- New Teak Interior Doors
- Installing V-Berth Panels
- Frabracating a New Teak Shower Mat in Head
- Making New Cabinet Doors for the Head
- Refinishing the Teak and Holly cabin sole
- Electrical Systems
- BMS Test Setup
- DIY LiFePO4 560AH Battery
- Solar and Power Upgrades
- Alternative Battery Switch System
- Galvanic Isolator
- Electronic Systems
- Long Range WiFi
- Replacing Autopilot Drive Motor
- New Below Deck Autopilot System
- Repair Yanmar Buzzer Alarm
- Ground Tackle
No comments:
Post a Comment